Wall construction like all siding materials western red cedar performs best when installed properly on a suitable frame.
Minimum distance from cedar siding to roofing.
The closer to the grade the sooner your siding will deteriorate.
Cedar siding should be securely nailed to framing members.
Slope is defined as the change in height rise as compared to the distance up the roof area run and is measured in inches.
Start with the bottom course using a furring strip to support the lower edge.
I added in my report a note that 2 minimum clearance is required between the siding and the patio surface.
Each succeeding course overlaps the upper edge of the previous one by a minimum of 1 inch.
Roof ground clearance.
Trim that extends down to a roof such as on dormer sidewalls and decks require a minimum of a 1 to 2 inch gap to avoid moisture wicking into the end grain.
Siding and trim that extends down to a roof dormers second floors etc and decks requires a minimum of a 2 inch gap to avoid wicking.
Can i put new cedar shingle siding over my existing cedar shingle siding.
Details like this let me stay profitable and allow me.
Homes with gables at different levels on the roofs often have siding that meets the roof line.
This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard.
How i detail the rake.
Ground contact areas trim such as water table or skirt boards must be a minimum of 6 inches but better to be 18 above the ground.
For cedar siding over wood sheathing nailed at studs for application over foam sheathing add the thickness of the foam to the tabulated nail length.
The reason for requiring a minimum distance from board edges and ends is clear.
Trim such as water table or skirt boards must be a minimum of 6 inches above the grade.
Having your siding too close to the ground is just asking for trouble.
I run a trim board along the rake keeping this the required distance above the roof surface and bring my siding board down to the trim maintaining a 1 4 inch gap that gets caulked.
For example a slope of 4 12 means 4 inches of rise for every 12 inches in run.
The material can be installed across the minimum 3 of.
The number of board spaces between the soffit and bottom of the lowest piece of siding at the foundation should be such that the overlap is as per the table.